Konstantin Grcic’s modular workplace system for Vitra, launched 19–20 March 2026 alongside Stephan Hürlemann’s Reset under Vitra’s ‘Beta’ workspace project. Named pieces include Scout Work, Scout Work Mobile, Scout Sprint, Scout Summit and Scout Meet.
- Brand
- vitra
- Description
- Five-piece modular workplace family of tubular-steel desks, mobile workstations and meeting tables. Frame extends above the work surface to act as both structural support and an accessory rail (hooks, pinboards). Height adjustment and tilting are entirely mechanical — no motors, no app.
- Designer
- konstantin-grcic
- Themes
- collaboration, craft
- Year
- 2026
Connections
Outbound
- Produced by → Vitra
- Designed by → Konstantin Grcic
- References → Modular workspace
- References → Reset — Co-launched March 2026 as paired Vitra 'Beta' workplace systems.
- Extends → Hack — Scout (2026) extends Grcic's earlier DIY flat-pack Hack system for Vitra (2016).
Inbound
- Junya Ishigami Pavilion (Vitra) → References — Vitra's 2026 split campus strategy — Ishigami pavilion as architecture-statement
Posts
- Vitra Campus 2026: Ishigami Pavilion vs Grcic Scout primary 6 May 2026
- Konstantin Grcic Exhibition Design, 2009–2026 16 May 2026